Customization: | Available |
---|---|
After-sales Service: | 12 Months |
Warranty: | 12 Months |
Still deciding? Get samples of $ !
Order Sample
|
Shipping Cost: | Contact the supplier about freight and estimated delivery time. |
---|
Payment Methods: |
![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() |
---|---|
Support payments in USD |
Secure payments: | Every payment you make on Made-in-China.com is protected by the platform. |
---|
Refund policy: | Claim a refund if your order doesn't ship, is missing, or arrives with product issues. |
---|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Model No | XJD2022 | Certification | ISO/TS16949, ISO9001 |
Classification | Windlass | Drum Brakes Classification | Windlass |
Main Market | North America, Africa, Mild Eastern, Western Europe, Oceania, Domestic Market |
Application | Windlass,Winch |
Application | Static Friction | Collor | Yellow |
Description | Woven Cotton Brake Lining | Coefficient | 0.6 |
Width | 600mm | Thickness | 3.2- 25.4mm |
Used in | Mooring Winches, Sugar Milling Equipments | Transport package | Pallet |
Specification | as required | Trademark | XJD |
Origin | Shanghai, China | HS Code | 5910000000 |
Prodution Capacity | 50000 piece/year |
Package Size | 50.00cm* 50.00cm* 12.00cm |
Package Gross Weight | 120000KG |
colour | yellow |
thickness | 4mm-30mm |
width | 30mm-600mm |
length | 10m, 15m, 20m,.... according to your needs |
Frequently Asked Questions (FAQ)
Q1. What is the duration of your warranty period?
A: Our Starye products come with a comprehensive one-year warranty, excluding any artificial damage or misuse.
Q2: Where can I obtain more detailed information about this product?
A: For more in-depth details, engage with our dedicated sales team online.
Q3: Is it possible to receive a sample?
A: We are pleased to offer samples for testing; however, shipping charges will typically be borne by you.
Q4: What are your payment terms?
A: Our payment structure requires a 50% deposit via T/T and the remaining 50% before delivery. We provide product and packaging photos
before the final balance is settled.
Q5: Could you elaborate on your delivery timeline?
A: Delivery typically spans 10 to 40 days post-advance payment receipt. The exact timeframe hinges on item specifics and order volume.
The specific delivery time depends on the items and the quantity of your order.
Q6: Are you capable of manufacturing based on samples?
A: Absolutely, we can manufacture according to your samples or detailed technical drawings, including mold and fixture creation.
Q7:What strategies ensure a long-lasting business relationship with clients?
A: 1. We consistently deliver high quality and competitive pricing, maximizing customer benefits.
2. We cherish every client, treating them as friends and conducting business with genuine respect and friendship,
irrespective of their origin.